IMPORTANT: Please ensure to check your email's spam folder if you are awaiting a response from us. Thank you! :)

Mountsion CBS

Mountsion CBS

Installed:

July 2025

Project Type:

School

Location:

Waterford

Budget:

1875

About the Project:

Mountsion CBS Secondary is based in Waterford City. There is approx 467 boys attending. 8 Horizontal Boards were added too an indoor block wall to incorporate movement breaks for students.

Photos from the Installation:

(Click to Enlarge)

Request A FREE Quote

Share This Post:

Featured Products

The above installation featured the following SmallWall products...