fbpx
IMPORTANT: Please ensure to check your email's spam folder if you are awaiting a response from us. Thank you! :)

Scoil Pobail Mhic Dara

Scoil Pobail Mhic Dara

Installed:

April 2024

Project Type:

School

Location:

Carraroe

Budget:

2250

About the Project:

Scoil Mhic Dara in Carraroe, Co Galway has over 130 student in the school. We installed 8 Traverse Boards with 2 half boards to fit the dividing pillar, a Bridge, an A Frame, 4 Pegboards and a total of 42 mats.

Photos from the Installation:

(Click to Enlarge)

Request A FREE Quote

Share This Post:

Featured Products

The above installation featured the following SmallWall products...