IMPORTANT: Please ensure to check your email's spam folder if you are awaiting a response from us. Thank you! :)

St Leonards NS

St Leonards NS

Installed:

March 2025

Project Type:

School

Location:

New Ross

Budget:

4550

About the Project:

12 x Horizontal Climbing Boards, 1 x Double Chess and Draughts table, 1 x Senior Cocoon Pad Base, ‘A’ Climbing Frame were installed into New Ross Wexford in March 2025. A great upgrade to their outdoor play area.

 

Photos from the Installation:

(Click to Enlarge)

Request A FREE Quote

Share This Post:

Featured Products

The above installation featured the following SmallWall products...